Question 1SSC CGL
mediumPYQ

A can build up a wall in 9 days while B can break it in 4 days. A has worked for 4 days and then B joined to work with A for another 2 days only. In how many days will A alone build up the remaining part of the wall?

Click any option to test your answer, or review the verified solution below.

Detailed Mathematical Solution

Step-by-step verified derivation with KaTeX equations

Correct Answer:A: (a) 7 $\frac{1}{2}$ days

A's rate = 19\frac{1}{9} wall/day; B's rate (breaking) = −14-\frac{1}{4} wall/day.

Work done by A in first 4 days = 4×19=494 \times \frac{1}{9} = \frac{4}{9} wall.

For next 2 days, A builds and B breaks. Net rate = 19−14=4−936=−536\frac{1}{9} - \frac{1}{4} = \frac{4-9}{36} = -\frac{5}{36} wall/day (net breaking).

Work done in these 2 days = 2×(−536)=−1036=−5182 \times \left(-\frac{5}{36}\right) = -\frac{10}{36} = -\frac{5}{18} wall (i.e., wall broken).

Total work completed after 6 days = 49−518=818−518=318=16\frac{4}{9} - \frac{5}{18} = \frac{8}{18} - \frac{5}{18} = \frac{3}{18} = \frac{1}{6} wall.

Remaining work = 1−16=561 - \frac{1}{6} = \frac{5}{6} wall.

Time for A alone to build remaining = remaining workA’s rate=5619=56×9=456=712\frac{\text{remaining work}}{\text{A's rate}} = \frac{\frac{5}{6}}{\frac{1}{9}} = \frac{5}{6} \times 9 = \frac{45}{6} = 7\frac{1}{2} days.

Therefore, the correct option is (a) 7127\frac{1}{2} days.

Final ConclusionTherefore, the correct choice is A: (a) 7 $\frac{1}{2}$ days
Verified 100% Accurate

Joru AI Exam Intelligence Studio

AI Memory Trick & Mnemonic

Exam Recall

Rapid cognitive retrieval rule to recall under high-pressure exam conditions for Work and Time.

LCM work, add rates, track net, divide remaining.

Topper's Speed Method (AI Shortcut)

Speed Drill
Target: < 45s

How top 1% rankers bypass long textbook steps using composite ratios and mental arithmetic.

1

Set total work = LCM of days.

2

Calculate individual rates.

3

Compute work done in phases.

4

Find remaining work and time.

Distractor Trap Analysis

Mistake Prevention
Trap Risk: 40%

Forensic analysis of why candidates mistakenly pick wrong distractor choices.

Pitfall & Trap Prevention: Involves negative work (breaking) which is a common trap.

Exam Benchmark Specifications

Official PYQ
Benchmark Time
45s
Target solving speed
Difficulty
medium
Exam tier rating
Depth
intermediate
Cognitive taxonomy
Target Exam
SSC CGL
Quantitative Aptitude

Core Concept & Theory Reference

Work and Time

Work and time problems can be solved by assuming total work as LCM of individual times. Rates are additive, with destructive work taken as negative.